Browse by subject

Records are organized by subject to make it easier to follow the project history, locate original documents and compare related records from different sources.

Water Reuse

Direct Potable Reuse

Engineering records, regulatory approvals, treatment information, testing documents and operational records from the 2014–2015 emergency DPR project.

Browse DPR records →
Water Reuse

Indirect Potable Reuse

Records concerning Wichita Falls' permanent indirect potable reuse system and the return of treated wastewater to Lake Arrowhead.

Browse IPR records →
Contaminants

NDMA Records

Laboratory results, monitoring data, correspondence, engineering discussions and other Wichita Falls records that specifically address NDMA.

Browse NDMA records →
Treatment

UV Treatment & Pilot Testing

Records concerning ultraviolet treatment, operating dose, treatment design, pilot testing and NDMA-related treatment evaluations.

Browse UV records →
Government

Regulatory Records

Approvals, correspondence, reports and other records involving the City of Wichita Falls, TCEQ, EPA and other government agencies.

Browse regulatory records →
Public Records

Records Requests

Public information requests, federal FOIA requests, agency responses and records produced through those requests.

Browse records requests →
Source Documents

Key documents

These twelve records trace the history of NDMA and potable reuse in Wichita Falls from the first federal detections through the records still outstanding today. Every one is linked to the original document. The full library of several hundred documents is below.

2009

Wichita Falls UCMR 2 NDMA Results

Federal monitoring detected NDMA in all fifteen Wichita Falls finished and distribution water samples collected in 2009, five years before potable reuse began. Results ranged from 2.3 to 36.1 ng/L.

Source: U.S. Environmental Protection Agency
View document →
Official EPA archive
1 Aug 2012

TCEQ Reuse Analyte Monitoring Recommendations

TCEQ’s water quality monitoring recommendations for direct and indirect reuse facilities. NDMA and NPYR are identified by EPA Method 521 as highly recommended for sampling.

Source: Texas Commission on Environmental Quality
15 Feb 2013

TrojanUV Correspondence on NDMA and UV Oxidation

TrojanUV sends City staff UV oxidation case studies and NDMA information, and asks directly whether NDMA levels leaving the River Road Wastewater Treatment Plant have been examined.

Source: Project correspondence, obtained through public information request
4 Mar 2013

Appendix K: 45-Day Verification Testing Protocol

Parameter table for the original DPR verification testing protocol, explicitly including NDMA and NPYR testing.

Source: City of Wichita Falls
5 Sept 2013

TCEQ Enclosure A: Full-Scale Verification Testing Protocol

The verification testing protocol establishing minimum requirements for the direct potable reuse project before operation.

Source: Texas Commission on Environmental Quality
5 Sept 2013

TCEQ Enclosure B: Monitoring and Reporting of Operating Conditions

The monitoring diagram mapping every required sampling point through the DPR system, from wastewater effluent through blending to finished water. No nitrosamine appears anywhere on it.

Source: Texas Commission on Environmental Quality
20 May 2014

DPR Treatment Process and Testing Protocol

City document describing the treatment process, safety measures and testing protocol developed for the direct potable reuse project before water entered the distribution system.

Source: City of Wichita Falls
View document →
Hosted by the City
5 Aug 2014

TCEQ Enclosure G: Unregulated Contaminants of Concern

TCEQ again recommends quarterly NDMA and NPYR monitoring by Method 521, marked highly recommended for sampling. It was not required.

Source: Texas Commission on Environmental Quality
2014

TCEQ Drinking Water Compliance Report

State compliance report documenting TCEQ’s conditional approval of the Wichita Falls direct potable reuse project in July 2014.

Source: Texas Commission on Environmental Quality
View document →
Official TCEQ archive
28 Dec 2015

Garver Draft Final Report: UV-AOP Pilot Testing

Draft final report from the WateReuse Texas funded pilot conducted by Garver Engineering at the Cypress Water Treatment Plant, evaluating filtration and oxidation options for Wichita Falls reverse-osmosis permeate.

Source: Garver Engineering, obtained through public information request
2016

Garver Presentation: UV-AOP Findings

Presentation slides reporting that NDMA was the most prominent micropollutant found in Wichita Falls RO permeate samples, and was most efficiently mitigated by UV alone.

Source: Garver Engineering, WateReuse Texas
26 June 2026

Eurofins Response Regarding 2015 Pilot Laboratory Reports

The laboratory confirms it still holds the 2015 Wichita Falls pilot reports but states they can be released only to the firm that submitted them. The underlying results have been requested and not obtained.

Source: Eurofins, correspondence
Scientific Research

Research that provides context for the records

Scientific literature is maintained separately from the Wichita Falls record so the two remain easy to distinguish. The Research library covers NDMA formation, reverse osmosis, ultraviolet treatment, potable reuse, distribution systems and health and toxicology.

Official Resources

Agencies and official references

These agencies maintain drinking-water records, analytical methods, regulatory information, local water-system information and environmental health resources relevant to this project.

Federal

U.S. Environmental Protection Agency

Federal resources for drinking-water monitoring, unregulated contaminants and laboratory methods used to measure nitrosamines including NDMA.

State Regulation

Texas Commission on Environmental Quality

Texas regulation and oversight of public drinking-water systems, including monitoring, compliance, approvals and drinking-water system information.

Local Water System

City of Wichita Falls

Current information about Wichita Falls water sources, purification, treatment facilities, drinking-water reports and local water-system operations.

Public Health

Texas Department of State Health Services

Environmental epidemiology, health assessment and toxicology resources used to evaluate environmental exposures and potential public-health concerns.

Document Archive

Review the source record directly.

The twelve documents highlighted above are a small part of the collected record. The full library holds 689 public records, correspondence, engineering materials, laboratory reports and regulatory documents covering Wichita Falls potable reuse, NDMA monitoring and treatment decisions, from 2003 to 2026.

Wherever possible, original source documents are provided so readers can review the record for themselves.

The library is searchable and filterable by subject. It is updated as records are received; how documents are sourced, handled and redacted is set out on the Methodology and Sources page.

Source Documents

Document Library

Search and review the source records collected for this project. Documents are organized by the category assigned in the public records archive and open directly from the public R2 document repository.

Showing all 689 documents

July 3, 2003 PDF

TCEQ IWUD Record Wastewater Reuse Exception Request Granted Letter

View document
August 19, 2004 PDF

TCEQ 2004 Conditional Approval for Cypress SWTP Expansion Project

View document
June 26, 2006 PDF

City Grandfathered Cryptosporidium Data Package

View document
August 27, 2007 PDF

TCEQ Acceptance of Second Hf Membrane Wastewater Reuse Pilot Study

View document
August 27, 2007 PDF

TCEQ Letter on Second Hf Membrane Wastewater Reuse Pilot Study

View document
August 22, 2008 PDF

City of Wichita Falls Notification of Completion of Construction of the RO Membrane Plant

View document
August 25, 2008 PDF

TCEQ Approved CT Study for Cypress RO Membrane Plant 3 3 Mgd MF RO

View document
April 30, 2009 PDF

TCEQ Reclaimed Water Authorization for River Road WWTP Effluent Type

View document
August 2011 PDF

City TCEQ Surface Water Monthly Operating Report SWMOR Cypress 1961 Plant

View document
August 2011 PDF

City TCEQ Surface Water Monthly Operating Report SWMOR Cypress

View document
August 2011 PDF

City TCEQ SWMOR for Cypress Microfiltration R O Plant August

View document
October 3, 2011 PDF

TCEQ Revised Contact Time CT Study Approval for Cypress 2010 Water

View document
October 27, 2011 PDF

Biggs Mathews Cypress Water Treatment Plant CT Study Flow Diagram Pre DPR Oct

View document
February 22, 2012 PDF

Biggs Mathews Biggs and Mathews Notification to TCEQ Proposing Chloramine Biocide

View document
March 2012 PDF

Cdm Smith Cdm Smith March 2012 Site Map of Proposed Wichita Falls Reuse System

View document
March 2012 PDF

City Multi Year 2000 2012 Narrative Summary of River Road WWTP Volatile

View document
April 5, 2012 PDF

City CDM Strategy to Differentiate Wichita Falls IPR Proposal from

View document
April 5, 2012 PDF

City Earlier Message in April 2012 Thread Differentiating Wichita Falls

View document
April 12, 2012 PDF

TCEQ Conditional Approval of Chloramines Biocide Addition at Cypress

View document
May 7, 2012 PDF

CDM Smith CDM Smith Letter to TCEQ Revising Wichita Falls Reclaim Water Project

View document
June 29, 2012 PDF

CDM Smith CDM Smith Lake Arrowhead Discharge IPR Would Not Require the

View document
June 29, 2012 PDF

Corlett Schreibers June 29 2012 Reaction to TCEQ Response Draft Guidelines

View document
June 2012 PDF

City TCEQ Surface Water Monthly Operating Report SWMOR Cypress 2010 TCEQ

View document
July 2, 2012 PDF

CDM Smith Reaction to TCEQ's June 2012 Response on Reuse Project Schreiber

View document
August 30, 2012 PDF

City Reuse Project Strategy After Aug 29 2012 TCEQ Call Earlier Message in

View document
November 13, 2012 PDF

City Concept Paper for Emergency DPR of Wastewater

View document
November 13, 2012 PDF

City Concept Paper for Emergency Reuse of Wastewater Effluent As a Source

View document
November 26, 2012 PDF

TCEQ Fw Wichita Falls Concept Paper Nitrate Unit Correction Email

View document
January 22, 2013 PDF

City Water Supply Alternatives Presentation January

View document
February 8, 2013 PDF

City Appendix F Concept Paper for Emergency Reuse of Wastewater Effluent

View document
March 8, 2013 PDF

City IPR DPR Reuse Options Cost Comparison Spreadsheet for March 19

View document
March 13, 2013 PDF

City Council Presentation Wichita Falls Long Term Reuse Study March

View document
March 13, 2013 PDF

City Draft Wichita Falls Long Term Reuse Study Council Presentation 3

View document
May 10, 2013 PDF

City DPR Preliminary Engineering Report and Full Scale Verification Test

View document
May 10, 2013 PDF

TCEQ Pir Production Oct 2 2025 May 10 2013 Preliminary Engineering

View document
May 17, 2013 PDF

City Water Reuse Projects Presentation Covering

View document
May 2013 PDF

Biggs Mathews Partial Plan Set for Temporary DPR Conveyance Facilities Cwf 13

View document
May 2013 PDF

City DPR Preliminary Engineering Report Submittal to TCEQ May 2013 no Text

View document
May 2013 PDF

City DPR Preliminary Engineering Report Submittal to TCEQ May

View document
May 2013 PDF

Unknown Contract Documents Partial Plans for Construction of the Temporary

View document
June 26, 2013 PDF

Biggs Mathews Temporary DPR Conveyance Facilities Cypress WTP Connection Detail and

View document
June 26, 2013 PDF

Biggs Mathews Temporary Site Piping Modification Drawings Cypress WTP Sealed

View document
June 27, 2013 PDF

Biggs Mathews City Response to Tceqs 1st Set of 13 Questions 6 18 13 on the

View document
June 27, 2013 PDF

Biggs Mathews Cypress WTP Connection Detail Temporary DPR Conveyance Facilities

View document
June 27, 2013 PDF

Biggs Mathews Response to TCEQ 1st Set of PER Questions Engineering Letter

View document
June 27, 2013 PDF

Biggs Mathews River Road WWTP Process Schematic and Raw Effluent Pathogen Data

View document
June 27, 2013 PDF

TCEQ Fw Transmittal of City Response to 1st Set of PER Questions Email

View document
July 16, 2013 PDF

City Council Agenda Item Authorizing Temporary Water Reuse Conveyance

View document
July 19, 2013 PDF

Biggs Mathews Drawings Submitted with Citys 2nd Response to TCEQ Questions Jul

View document
July 19, 2013 PDF

Biggs Mathews Drawings Temporary DPR Treatment Facilities and Site Piping

View document
August 29, 2013 PDF

City Appendix O CT Study Request Enclosure H1 Description Schematic T10

View document
September 12, 2013 PDF

Unknown Backwash Procedure and Air Gap Isolation Plan for DPR Full Scale

View document
December 9, 2013 PDF

Biggs Mathews Final Engineering Report for Temporary Direct Potable Reuse Project

View document
December 9, 2013 PDF

Biggs Mathews Final Engineering Report for the Temporary Direct Potable Reuse

View document
December 10, 2013 PDF

Biggs Mathews Section 17 0 Report Closure and Recommendations of the DPR

View document
December 2013 PDF

Biggs Mathews Final Engineering Report for Temporary Direct Potable Reuse Project

View document
December 2013 PDF

Biggs Mathews Final Engineering Report for the Temporary Direct Potable Reuse

View document
2013 PDF

City 2013 Consumer Confidence Drinking Water Quality

View document
January 26, 2014 PDF

City DPR Verification Protocol Bench Sheets Cypress WTP MF RO and

View document
January 27, 2014 PDF

City Alarms and Shutdowns 4 Scada Alarm Log Excerpts Server05 20140125al

View document
January 27, 2014 PDF

City Cypress WTP Scada Screen Prints Jan 27 28 2014 Alarm Summary

View document
January 27, 2014 PDF

City Daily River Road WWTP Reclaimed Water Summary Turbidity Cbod E Coli

View document
January 30, 2014 PDF

City Citys Formal Follow Up Requests After Tceqs FSV Start Site Visit Jan

View document
February 4, 2014 PDF

City River Road WWTP Scada Alarm Event Log Dec 2013 and Cl2 Influent

View document
February 21, 2014 PDF

TCEQ Summary of Findings from Site Visit at the Start of the Full

View document
March 4, 2014 PDF

City Cypress WTP Scada Screens 2010 Plant Transfer Pump Controls and

View document
March 29, 2014 PDF

Kfdx Tv News Report Wichita Falls Delivers Full Scale Verification Test Fsvt

View document
April 10, 2014 PDF

City Follow Up Letter Submitting Missing FSV Report Data Viruses

View document
April 25, 2014 PDF

City Appendix O Updated Cts City Letter to TCEQ Updating CT Contact Time

View document
May 1, 2014 PDF

Times Record News News Article TCEQ Re Use Decision Expected Soon May 1 2014 Forwarded

View document
May 5, 2014 PDF

City Alarm and Shutdown Triggers for Full Scale Operation of the Temporary

View document
May 6, 2014 PDF

City DPR SOP Pipeline Inspection and Emergency Response TCEQ Version 1 for

View document
May 6, 2014 PDF

City DPR SOP Planned Maintenance TCEQ Version 1 Prepared by Bill Thornton

View document
May 6, 2014 PDF

City DPR SOP River Road Power Or Equipment Failure Guidelines TCEQ Version

View document
May 6, 2014 PDF

City Wf DPR SOP Foaming at the River Road WWTP Surfactant Detection

View document
May 7, 2014 PDF

City Chain of Command SOP V1 TCEQ Names DPR Leadership Structure and

View document
May 7, 2014 PDF

City Communication Between the River Road WWTP and the Cypress WTP SOP V1

View document
May 7, 2014 PDF

City DPR SOP Foaming at the River Road WWTP TCEQ V1 May 7 2014 with Staff

View document
May 7, 2014 PDF

City DPR SOP River Road Microscopic Toxicity Shutdown Trigger Procedure

View document
May 7, 2014 PDF

City DPR SOP Ww 04 River Road High Chlorine Demand Or Loss of Chlorine

View document
May 7, 2014 PDF

City Fish Kill at River Road Outfall Monitoring Pond SOP V1

View document
May 7, 2014 PDF

City River Road WWTP Petroleum Detection in Secondary Clarifiers SOP Ww

View document
May 7, 2014 PDF

City River Road WWTP Shutdown Communication Protocol SOP V1 May 7

View document
May 7, 2014 PDF

City River Road WWTP Surfactant Foaming Agent Test SOP V1 May 7

View document
May 7, 2014 PDF

City SOP Defining the Low Monochloramine Residual 1 0 Mg L at Sample Point

View document
May 7, 2014 PDF

City SOP Establishing the Automatic Turbidity Based Shutdown Trigger for

View document
May 7, 2014 PDF

City SOP for Detecting and Responding to High Artificial Dissolved Oxygen

View document
May 7, 2014 PDF

City SOP for Observing and Responding to Foaming Possible Surfactants at

View document
May 8, 2014 PDF

City DPR SOP Chlorine Injection Failure at River Road WWTP TCEQ Review V1

View document
May 8, 2014 PDF

City Draft SOP Defining DPR Pathogen Giardia Cryptosporidium Virus E Coli

View document
May 8, 2014 PDF

City SOP Defining the DPR Shutdown Trigger E Coli Action Level at the

View document
May 9, 2014 PDF

City Chain of Command SOP V2 Same Leadership Structure and Contact Numbers

View document
May 9, 2014 PDF

City Clean Typed Version of the SOP Defining DPR Pathogen Action Levels

View document
May 9, 2014 PDF

City Communication Between the River Road WWTP and the Cypress WTP SOP V2

View document
May 9, 2014 PDF

City DPR SOP Ww 013 Chlorine Injection Failure Version 2 May 9

View document
May 9, 2014 PDF

City DPR SOP Ww 04 River Road High Chlorine Demand Or Loss of Chlorine

View document
May 9, 2014 PDF

City DPR SOP Ww 05 River Road Power Or Equipment Failure Version

View document
May 9, 2014 PDF

City DPR SOP Ww A2 Communication Between River Road WWTP and Cypress WTP

View document
May 9, 2014 PDF

City DPR SOP Ww M1 Planned Maintenance Version 2 Revised May 9

View document
May 9, 2014 PDF

City DPR SOP Ww M2 Pipeline Inspection and Emergency Response Version

View document
May 9, 2014 PDF

City Revised SOP Ww 012 Defining the DPR Shutdown Trigger E Coli Action

View document
May 9, 2014 PDF

City Revised SOP Ww 06 Defining DPR Pathogen Action Levels at the Ccb

View document
May 9, 2014 PDF

City Revised SOP Ww 07 for Low Monochloramine Residual Response with

View document
May 9, 2014 PDF

City Revised SOP Ww 08 for High Dissolved Oxygen Demand at River Road WWTP

View document
May 9, 2014 PDF

City River Road WWTP Solids Washout Into the Chlorine Contact Basin SOP Ww

View document
May 10, 2014 PDF

City DPR SOP Power Failure Procedure at Cypress WTP Shut Off Rrwwtp

View document
May 10, 2014 PDF

City DPR SOP Ww 05 River Road Power Or Equipment Failure TCEQ Version

View document
May 10, 2014 PDF

City DPR SOP Ww M1 Planned Maintenance TCEQ Version 2 Approved May 10

View document
May 10, 2014 PDF

City MF RO Emergency Shut Down SOP V1

View document
May 10, 2014 PDF

City Revised SOP Ww 016 for the Automatic Turbidity Shutdown Trigger

View document
May 10, 2014 PDF

City SOP for Ground Storage Tank Gst Level Management to Maintain CT

View document
May 10, 2014 PDF

City SOP for Monitoring Maintaining the 10 Mg Ground Storage Tank Gst

View document
May 10, 2014 PDF

City SOP for Observing and Responding to Foaming Possible Surfactants at

View document
May 11, 2014 PDF

City DPR SOP Primary and Secondary Chemical Monitoring at Point of Entry

View document
May 11, 2014 PDF

City DPR SOP Primary Secondary Mcl Exceedance at Point of Entry Shutdown

View document
May 11, 2014 PDF

City Tthm Haa5 Exceedance at Point of Entry Poe Shutdown SOP

View document
May 12, 2014 PDF

City 2010 Filter Backwash SOP TCEQ Review Version 2 May 12 2014 with

View document
May 12, 2014 PDF

City DPR Lagoon Pump SOP TCEQ Version 1 May 12

View document
May 12, 2014 PDF

City Wf DPR SOP CT Calculation Procedure Disinfection Zones D1 D5 for

View document
May 12, 2014 PDF

City Wf DPR SOP Ground Storage Tank Gst Level Procedure

View document
May 13, 2014 PDF

City DPR SOP Ww M2 Pipeline Inspection and Emergency Response Version

View document
May 13, 2014 PDF

City MF RO Emergency Shut Down SOP V2

View document
May 13, 2014 PDF

City Multi Page Training Sign Off Log for City DPR Plant Staff Covering

View document
May 13, 2014 PDF

City Operator SOP Training Certification Logs May 13 14 2014 Full DPR SOP

View document
May 14, 2014 PDF

City DPR SOP Ww 013 Chlorine Injection Failure Version 3 May 14

View document
May 15, 2014 PDF

City DPR After Action Report Draft Operational Problem Log May

View document
May 16, 2014 PDF

City CT Calculator Worksheets Enclosure H1 CT Study for the Wichita Falls

View document
May 16, 2014 PDF

City Cypress WTP Daily Microfiltration RO Operating Data Sheet May 16

View document
May 20, 2014 PDF

City Steps in the DPR Water Treatment Process Seven Step Public

View document
May 22, 2014 PDF

City SOP Ww 017 for Dosing Liquid Ammonia Sulfate Las to Maintain

View document
May 28, 2014 PDF

City Response to TCEQ Review of the Full Scale

View document
May 2014 PDF

City Draft After Action Report DPR Operational Problems May 2014 River

View document
June 9, 2014 PDF

City 2010 Filter Backwash SOP TCEQ Review Version 3 June 9

View document
June 9, 2014 PDF

City SOP for 2010 Plant Filter Backwash Procedure Draft V3 Notes Manual

View document
June 11, 2014 PDF

City DPR SOP Microfiltration Membrane Pinning Procedure Establishes the MF

View document
June 12, 2014 PDF

City DPR SOP Foaming at the River Road WWTP Ww 09 TCEQ V3 June 12

View document
June 12, 2014 PDF

City Further Revised SOP Ww 016 for the Automatic Turbidity Shutdown

View document
June 12, 2014 PDF

City Further Revised SOP Ww 07 for Low Monochloramine Residual Sample

View document
June 13, 2014 PDF

City Surfactant Test SOP Ww O15 Final V4 June 13

View document
June 16, 2014 PDF

City 2010 Filter Start Up SOP TCEQ Review Version 2 June 16 2014 no

View document
June 16, 2014 PDF

City DPR SOP Fish Kill at the River Road Outfall Monitoring Pond Ww

View document
June 16, 2014 PDF

City DPR SOP High Pathogen at Ccb Effluent Ww 06 Defines the Numeric

View document
June 16, 2014 PDF

City DPR SOP High Turbidity at Secondary Combined Effluent Sample Site 1j

View document
June 16, 2014 PDF

City DPR SOP Ww 04 River Road High Chlorine Demand Or Loss of Chlorine

View document
June 16, 2014 PDF

City Fish Kill at River Road Outfall Monitoring Pond SOP V3 TCEQ

View document
June 16, 2014 PDF

City Revised SOP Ww 07 Introducing a Water Temperature Dependent

View document
June 16, 2014 PDF

City River Road Shutdown Communication Protocol SOP Ww A1 Between River

View document
June 16, 2014 PDF

City River Road WWTP Discolored Water in the Headworks and Primaries SOP

View document
June 16, 2014 PDF

City River Road WWTP Petroleum Detection in Secondary Clarifiers SOP Ww

View document
June 16, 2014 PDF

City RO Permeate Tank Operation SOP Levels Sodium Hydroxide Dosing

View document
June 17, 2014 PDF

City Alarm and Shutdown Triggers for Full Scale Operation of the Temporary

View document
June 18, 2014 PDF

City Cover Title and P E Seal Page of the Full Scale Verification Test

View document
June 23, 2014 PDF

City Alarm and Shutdown Triggers for Full Scale Operation of the Temporary

View document
June 23, 2014 PDF

City DPR Sdi Procedure SOP V2 June 23 2014 Once PER Shift Sdi 3 Pass RO

View document
June 23, 2014 PDF

City DPR SOP Waterborne Disease Outbreak Procedure V5 Revised 6 23

View document
June 24, 2014 PDF

City DPR SWMOR Procedure SOP V2 June 24 2014 Where DPR Monthly Report Data

View document
June 26, 2014 PDF

City DPR SOP Point of Entry Poe Nitrate Sampling Procedure Sample Site

View document
June 26, 2014 PDF

City DPR SWMOR Procedure SOP V3 June 26 2014 12 Pages Final Pre Startup

View document
June 28, 2014 PDF

Wichita Falls Times Record News Report TCEQ Conditionally Approves Full Scale DPR Operation

View document
July 9, 2014 PDF

City Official Faq on the DPR Project at Launch

View document
August 22, 2014 PDF

City of Wichita Falls City Letter to TCEQ Transmitting Virus Data for Full Scale

View document
August 22, 2014 PDF

City of Wichita Falls City Transmittal of FSVT 2 Virus Data EPA 1615 Culturable Virus

View document
August 2014 PDF

City Cypress DPR SWMOR August 2014 Revised Explicitly Corrects a Failure

View document
September 10, 2014 PDF

City Surface Water Monthly Operating Report SWMOR Cypress DPR

View document
September 2014 PDF

City Cypress DPR SWMOR September 2014 with Addendum Direct Potable Reuse

View document
October 10, 2014 PDF

City Surface Water Monthly Operating Report SWMOR Cypress DPR

View document
October 30, 2014 PDF

Freese Nichols Cypress WTP Capacity Summary Table in Progress Treatment Unit

View document
October 2014 PDF

City September 2014 Cypress DPR SWMOR with Addendum Direct Potable Reuse

View document
November 5, 2014 PDF

City Cypress WTP Capacity Summary Spreadsheet Treatment Unit Capacities

View document
November 5, 2014 PDF

City Cypress WTP Treatment Unit Capacity Summary MF Module Area Media

View document
November 14, 2014 PDF

City Cypress Mors Email with Attached Surface Water Monthly Operating

View document
November 19, 2014 PDF

City Cypress Mors Thread October 2014 DPR MF RO Reports and RO Nitrate

View document
November 20, 2014 PDF

City Revised August 2014 SWMOR for Cypress DPR MF RO Correcting Unreported

View document
November 20, 2014 PDF

City Surface Water Monthly Operating Report SWMOR Cypress DPR

View document
November 21, 2014 PDF

City Presentation on Water Resources Drought and Economic Development

View document
November 21, 2014 PDF

City Presentation Wichita Falls Water Resources and Impact on Economic

View document
November 2014 PDF

TCEQ on Site Project Training Opt Report First 120 Days of DPR Full

View document
December 2014 PDF

City Cypress DPR SWMOR December 2014 Plant Id 410791

View document
2014 PDF

Biovir Laboratories Chain of Custody Record for Cryptosporidium Giardia EPA 1623 Sampling

View document
2014 PDF

City 2013 Drinking Water Quality Report Announcing

View document
2014 PDF

City 2014 Drinking Water Quality Report Ccr Includes

View document
2014 PDF

City FSVT Site TCEQ 10j Selected MF Membrane Unit Filtrate Quality

View document
2014 PDF

City FSVT Site TCEQ 11j End of Wastewater Disinfection Zone 3 Combined MF

View document
2014 PDF

City FSVT Site TCEQ 1j Likely River Road WWTP Effluent DPR Influent 78 Mb

View document
2014 PDF

City FSVT Site TCEQ 22j Temporary RO Permeate Lagoon Lagoon no 3 Effluent

View document
2014 PDF

City FSVT Site TCEQ 40j Cypress 2010 SWTP Clearwell Effluent Finished

View document
2014 PDF

City FSVT Site TCEQ 42j Final Site in Series Likely Distribution Gst Or

View document
2014 PDF

City FSVT Site TCEQ 4j Cypress 2008 MF RO SWTP Static Mixers and Ferric

View document
2014 PDF

City TCEQ 10j Draft Report Selected MF Membrane Unit Filtrate Quality Full

View document
2014 PDF

City TCEQ 32j 2010 SWTP Flocculation Clarification FSVT Protocol Summary

View document
2014 PDF

City TCEQ 4j Through 42j Summary and Itineraries Full Listing of DPR

View document
2014 PDF

Unknown TCEQ 16j FSV Monitoring Selected RO Membrane Unit Feed Water Quality

View document
2014 PDF

Unknown TCEQ 20j FSV Monitoring Selected RO Membrane Unit Permeate Quality

View document
2014 PDF

Unknown TCEQ 21j FSV Monitoring Calculated Percent Removal Across RO

View document
2014 PDF

Unknown TCEQ 29j FSV Monitoring Calculated Percent Change in Water Quality

View document
2014 PDF

Unknown TCEQ 4j FSV Monitoring 2008 MF RO SWTP Static Mixers Coagulant

View document
January 10, 2015 PDF

City Surface Water Monthly Operating Report SWMOR Cypress DPR

View document
January 10, 2015 PDF

City SWMOR Cypress DPR Microfiltration RO December

View document
January 12, 2015 PDF

City Distribution System E Coli Coliform Bacteriological Testing Report

View document
January 12, 2015 PDF

City Draft Materials for January 2015 TCEQ Meeting DPR Plant Operational

View document
January 12, 2015 PDF

City Draft Materials for January 2015 TCEQ Meeting DPR Plant Summary

View document
January 12, 2015 PDF

City Draft Materials for TCEQ Meeting Southard Sends DPR Plant Summary

View document
January 12, 2015 PDF

City Draft Materials for TCEQ Meeting Southards Jan 12 2015 3 15 Pm

View document
January 12, 2015 PDF

City of Wichita Falls Water Water Bacteriological Testing Reports Total Coliform E Coli

View document
January 12, 2015 PDF

City Water Bacteriological Testing Report Sample Point 42j Jan

View document
January 12, 2015 PDF

Freese Nichols Draft Materials for Jan 14 2015 TCEQ Meeting DPR Operational Summary

View document
January 12, 2015 PDF

Freese Nichols Draft Materials for January 2015 TCEQ Meeting on Kemp Integration DPR

View document
January 13, 2015 PDF

City Correction DPR Summary Spreadsheet Shows Minimum Log Removal Not Ir

View document
January 13, 2015 PDF

City Southard Corrects Log Removal vs Ir Values in DPR Plant Summary

View document
January 14, 2015 PDF

City E Coli Lab Bench Sheet Sample Point 2jb Jan

View document
January 15, 2015 PDF

City Closing of TCEQ Meeting Draft Materials Thread DPR Summary Used to

View document
January 15, 2015 PDF

City Draft Materials for TCEQ Meeting DPR Facility 5 Mgd Every Day Since

View document
January 15, 2015 PDF

City Draft Materials for TCEQ Meeting Southards Jan 15 2015 Closing Reply

View document
January 15, 2015 PDF

City Water Bacteriological Testing Report Collection Point RO Plant MF

View document
January 15, 2015 PDF

Freese Nichols Draft Materials for Jan 14 2015 TCEQ Meeting DPR Produced 5 Mgd Every

View document
January 15, 2015 PDF

Freese Nichols Draft Materials for TCEQ Meeting Full Thread Jan 15 2015 Final

View document
January 15, 2015 PDF

Freese Nichols Draft Materials for TCEQ Meeting Southard Confirms 5 Mgd Continuous

View document
January 15, 2015 PDF

Freese Nichols Draft Materials for TCEQ Meeting Southard Confirms 5 Mgd Daily DPR

View document
January 2015 PDF

City Cypress DPR SWMOR January 2015 with Addendum Direct Reuse and Lab

View document
January 2015 PDF

City Scada Chlorine Residual Trend Printout Chlorine Contact Basin

View document
January 2015 PDF

City Surface Water Monthly Operating Report Addendum for the DPR Plant

View document
February 10, 2015 PDF

City Surface Water Monthly Operating Report DPR Plant Addendum Locational

View document
February 10, 2015 PDF

City SWMOR Cypress DPR January 2015 with Direct Reuse Monitoring and Lab

View document
February 10, 2015 PDF

City SWMOR Cypress DPR Microfiltration RO January

View document
March 3, 2015 PDF

Freese Nichols Freese and Nichols Conceptual Plan for Integrated Desalination

View document
March 10, 2015 PDF

Freese and Nichols for City Supplemental Permeate Pump Station Plans Sheet Ps 1 Mechanical Plan

View document
March 10, 2015 PDF

Freese Nichols Supplemental Permeate Pump Station Engineering Plans March 10

View document
April 23, 2015 PDF

Freese Nichols Freese and Nichols Project Status Report Lake Kemp DPR Integrated

View document
April 24, 2015 PDF

TCEQ Approval for Construction of a Supplemental Permeate Pump

View document
May 29, 2015 PDF

City DPR Decommissioning Plan Submission to TCEQ

View document
July 9, 2015 PDF

Cdm Smith Wrf 4508 Call Invite with Attached Historical Monitoring Data Request

View document
July 17, 2015 PDF

TCEQ Conditionally Approves Temporary DPR Decommissioning Report

View document
July 17, 2015 PDF

TCEQ Exception Approval for Hf RO Membranes at Cypress 2008 RO Plant

View document
July 17, 2015 PDF

TCEQ Revised Contact Time CT Study for Cypress 2008 RO Membrane Plant

View document
July 21, 2015 PDF

Kauz News Report DPR Decommissioning Begins Transition Toward IPR

View document
July 21, 2015 PDF

Kauz Newschannel 6 News DPR Decommissioning Begins Pumps Shut Off July 21 2015 DPR

View document
July 24, 2015 PDF

City Wrf 4508 Historical Data Collection City Sending Cypress WTP DPR Data

View document
July 24, 2015 PDF

City Wrf 4508 Historical Data Collection City Submits Cypress WTP Utility

View document
July 30, 2015 PDF

Cdm Smith Wrf 4508 Historical Data Collection for River Road WWTP and Cypress

View document
August 5, 2015 PDF

City Wrf 4508 Historical Data Collection for River Road WWTP and Cypress

View document
August 21, 2015 PDF

Cdm Smith Wrf 4508 Follow Up Asks Cypress WTP to Confirm Monitoring Tab Is

View document
September 1, 2015 PDF

City Formal Notification of DPR Decommissioning

View document
September 1, 2015 PDF

City Notification to TCEQ That Decommissioning of the Temporary DPR

View document
2015 PDF

City 2015 Consumer Confidence Drinking Water Quality

View document
January 15, 2016 PDF

Twdb Webinar Overview of the Texas DPR Resource Document Listing Planned

View document
2016 PDF

City 2015 Drinking Water Quality Report Crediting

View document
March 2021 PDF

American Water Works Tracking Wichita Falls Path from DPR to IPR Opflow March 2021 by City

View document
2021 PDF

Awwa Opflow Opflow 2021 Tracking Wichita Falls Path from DPR to IPR City Staff

View document
Undated PDF

City Appendix B Rrwwtp Flow Diagram Tpdes Permit 210 Reclaim Water

View document
Undated PDF

Undated City Appendix C Wichita Falls 114 Year Precipitation Record and Combined

View document
Undated PDF

City Appendix D Pipeline Inspection and Emergency Response Plan 7 Page

View document
February 13, 2015 PDF

Garver Proposal to 2015 Watereuse Texas Crp Optimizing Selection of

View document
June 22, 2015 PDF

City Email Thread Sample Letter for Wichita Falls Pilot Proposal for

View document
June 22, 2015 PDF

City Nix Provides Cypress Wtp Shipping Address for Trojan Uvmax Pilot

View document
June 22, 2015 PDF

City Shipping Trojan Uvmax Pilot Reactor to Cypress Wtp for Watereuse

View document
June 29, 2015 PDF

City Garver Ordering Supplies for UV Pilot Testing at Cypress Wtp Lab

View document
June 29, 2015 PDF

City Logistics for Shipping Trojanuv Uvmax Pilot Reactor to Cypress Wtp

View document
June 29, 2015 PDF

City Nix Identifies Cypress Wtp Lab Supervisor Hunter Adams As Garvers

View document
June 29, 2015 PDF

Garver Trojan Uvmax Pilot Reactor Shipped to Cypress Wtp for Garver

View document
June 29, 2015 PDF

Garver Trojan Uvmax Pilot Reactor Shipped to Cypress Wtp for Watereuse Texas

View document
July 12, 2015 PDF

Garver Testing Protocol V3 for the Wichita Falls UV Pilot Garver Lead

View document
July 13, 2015 PDF

Garver Pilot Logistics Freezer Gel Packs and Insulated Shipping Boxes for

View document
July 21, 2015 PDF

City UV Pilot Testing at Cypress Wtp July 2015 Lawton Wastewater Effluent

View document
July 24, 2015 PDF

City Cypress Lab Returns TOC Results Garver Report 072415 PDF for the UV

View document
July 24, 2015 PDF

City Remaining Thm Samples from UV Pilot to Be Sent to Eaton Lab

View document
July 24, 2015 PDF

City Testing Protocol for Wichita Falls UV Pilot July 2015 TOC Results

View document
July 24, 2015 PDF

Freese Nichols Post Pilot Sample Handling City Lab TOC Results Delivered 4 Remaining

View document
August 11, 2015 PDF

City Garver Press Release on Watereuse Texas 50 000 Grant for UV AOP Pilot

View document
August 11, 2015 PDF

City Nix Asks Whether Garver Press Release Is the Fni Pilot UV Work Full

View document
August 11, 2015 PDF

Garver Press Release Pending Wf Approval Watereuse Texas Awards

View document
August 11, 2015 PDF

Garver Press Release Watereuse Texas 50 000 Grant for UV AOP Pilot at

View document
August 11, 2015 PDF

Garver Watts Confirms the Watereuse Texas UV AOP Pilot Work Has Already Been

View document
December 28, 2015 PDF

Garver Draft Final Report PDF Optimizing Selection of Filtration

View document
2016 PDF

Garver Presentation Slides on UV AOP for Watereuse Texas 2016 Image

View document
June 26, 2026 PDF

Eurofins Drinking Water and Eurofins Response to Researchers Request for 2015 Wichita Falls

View document
2002 PDF

City 2002 Industrial Wastewater Questionnaire Permit Application Listing

View document
September 2004 PDF

EPA Method 521 Determination of Nitrosamines in Drinking Water by Spe

View document
September 2004 PDF

EPA National Exposure EPA Method 521 Determination of Nitrosamines in Drinking Water by Spe

View document
June 19, 2007 PDF

EPA Office of Research and EPA Provisional Peer Reviewed Toxicity Values Pprtv for N

View document
2008 TXT

2010 EPA Combined Master Raw EPA Ucmr 2 Nationwide Occurrence Dataset All

View document
2008 TXT

2010 EPA Raw EPA Ucmr 2 Method 521 Nationwide Occurrence Data Including NDMA

View document
February 6, 2012 PDF

City Request to TCEQ for Updated Chloramines and Chlorine Dioxide

View document
July 2, 2012 PDF

City City's 2012 Ppcp Analyte List Ul Quote 7352 for Wastewater Effluent

View document
August 6, 2012 PDF

City Ul Laboratory Report 282064 Ppcp Pharmaceuticals Personal Care

View document
August 6, 2012 PDF

City Ul Laboratory Report 282121 Ppcp Analysis of River Road Wastewater

View document
August 6, 2012 PDF

Underwriters Laboratories Ul Laboratory Report on Ppcp Pharmaceuticals Personal Care Products

View document
August 14, 2012 PDF

CDM Smith CDM Smith Invites Wichita Falls to Participate in Waterrf

View document
August 15, 2012 PDF

CDM Smith City of Wichita Falls Commits to Participate in Waterrf

View document
August 15, 2012 PDF

City Agrees to Participate in Waterrf 4461 Nitrosamine

View document
September 2012 PNG

EPA Screenshot of EPA 2012 Guidelines for Water Reuse Section 6 2 2 2 on

View document
2012 PDF

City River Road WWTP Volatile Semi Volatile Gc Ms Library Scans 2000

View document
February 15, 2013 PDF

Trojanuv Sends Daniel Nix UV Oxidation Case Studies Ocwd Big Spring

View document
March 4, 2013 PDF

City Appendix K 45 Day Verification Testing Protocol Parameter Table for

View document
May 20, 2013 PDF

City Cryptosporidium and Giardia Data Method 1623 for River Road WWTP

View document
June 25, 2013 PDF

Biovir Laboratories Biovir Laboratories Virus Testing EPA Method 1615 on River Road WWTP

View document
November 26, 2013 PDF

Ul Llc Ul Llc Laboratory Test Menu Price Quote for the City of Wichita Falls

View document
January 3, 2014 PDF

EPA Effluent Violations Report for River Road Wwtf Npdes Tx0047686 12

View document
January 27, 2014 PDF

City Water Purification Laboratory Color Analysis

View document
January 27, 2014 PDF

City Water Purification Laboratory Threshold Odor

View document
January 2014 PDF

EPA Federal Facilities EPA Technical Fact Sheet N Nitroso Dimethylamine NDMA January

View document
May 7, 2014 PDF

City Chlorine Species Titration Sop V1 TCEQ Lab Method for Differentiating

View document
May 9, 2014 PDF

City Chlorine Species Titration Sop V2 Ww L5 References the Same

View document
June 16, 2014 PDF

City Chlorine Species Titration Sop V3 Clean Copy Ww L5

View document
June 16, 2014 PDF

City Chlorine Species Titration Sop V3 TCEQ Ww L5 References a

View document
June 16, 2014 PDF

City DPR SOP Monochloramine Residual and Las Liquid Ammonia Sulfate Ww

View document
June 16, 2014 PDF

City DPR SOP Monochloramine Residual Below Minimum at Site 2j Ww 07 Low

View document
August 5, 2014 PDF

TCEQ Enclosure G Unregulated Contaminants of Concern for Wichita

View document
August 14, 2014 PDF

Texas Department of State Tdshs State Laboratory Analysis Report for a City of Wichita Falls

View document
December 19, 2014 PDF

City River Road Wastewater Effluent Testing at Discharge Min Max Average

View document
December 19, 2014 PDF

City River Road WWTP Effluent Water Quality Min Max Average Data Sent to

View document
December 19, 2014 PDF

City River Road WWTP Effluent Water Quality Min Max Avg Data Tds Chloride

View document
2014 PDF

City Appendix B Table Wastewater Effluent Monitoring Results for

View document
February 3, 2015 PDF

CDM Smith City Agrees to Wrf 4508 DPR Safety Study at Level 1 Level 2 Only If

View document
February 3, 2015 PDF

City Agrees to Wrf 4508 DPR Study Participation at Level 1 Level

View document
February 4, 2015 PDF

CDM Smith City Sends Signed Wrf 4508 Commitment Letter with Discussed

View document
February 4, 2015 PDF

City CDM Smith Preparing EPA Water Reuse Guidelines DPR Amendment with a

View document
February 4, 2015 PDF

City Sends Signed Wrf 4508 Commitment Letter with Discussed

View document
July 21, 2015 PDF

Freese Nichols UV Testing at Cypress Wtp July 2015 Lawton Wastewater Effluent

View document
July 2015 PDF

Trojanuv UV Testing Using Lawton Ok Wastewater Oxidant Dosing and Sensor Port

View document
December 2016 PDF

EPA Office of Water Six Year Review 3 Technical Support Document for Nitrosamines EPA

View document
November 2017 PDF

EPA Technical Fact Sheet N Nitrosodimethylamine NDMA November

View document
November 2017 PDF

EPA Technical Fact Sheet on N Nitrosodimethylamine NDMA Properties

View document
September 17, 2025 PDF

City Official Water Treatment Webpage Describing the

View document
2026 PDF

City 2026 Drinking Water Quality Report Consumer

View document
Undated PDF

Undated City Appendix B Wastewater Effluent Monitoring Results for Unregulated

View document
Undated PDF

City Appendix O Unregulated Contaminants Detected in Wf Wastewater Tap Raw

View document
Undated PDF

Undated City Appendix O Unregulated Contaminants Information 9 Page Appendix

View document
Undated PDF

Undated EPA Iris Chemical Assessment Summary N Nitrosodimethylamine Casrn

View document
Undated PDF

Undated Trojanuv Nitrosamines NDMA Fact Sheet Sources Formation During Chlorine

View document
Undated PDF

Undated Unknown Appendix B Wastewater Effluent Monitoring for Unregulated Emerging

View document
Undated PDF

Undated Unknown Appendix O Unregulated Contaminants Detected Comparison Table

View document
September 22, 2004 PDF

TCEQ IWUD Index Entry Wastewater Reuse Exception 290 Rule 42 G

View document
September 12, 2006 PDF

TCEQ IWUD Record Wastewater Reuse Exception Request 290 42 G Denied

View document
January 31, 2007 PDF

TCEQ Letter Denying Revised CT Study Request for Cypress Street Wtp

View document
August 27, 2007 PDF

TCEQ IWUD Index Entry Hf Membrane Ww Reuse Protocol Exception

View document
August 27, 2007 PDF

TCEQ Review of Protocol for Second Hf Membrane Wastewater Reuse Pilot

View document
August 25, 2008 PDF

TCEQ Approval of the First CT Study for the Cypress RO Membrane Plant

View document
February 24, 2009 PDF

EPA Chloramines Q and a Excerpt Water Systems Disinfection Byproducts

View document
February 24, 2009 PDF

EPA Q and a Water Systems Disinfection Byproducts and the Use of

View document
August 18, 2009 PDF

Camp Dresser and Mckee CDM Cover Letter Transmitting 2007 08 Hf Membrane Pilot Study

View document
December 1, 2009 PDF

TCEQ IWUD Record Hf Membrane Ww Reuse Report Exception 290 42 G

View document
December 1, 2009 PDF

TCEQ Review of Cdms Hf UF Membrane Pilot Study Reports for River Road

View document
June 27, 2011 PDF

TCEQ Compliance Investigation Report Cci City of Wichita Falls Pws

View document
October 3, 2011 PDF

TCEQ CT Study Review Letter for Cypress Wtp RO Mwtp Disinfection

View document
February 23, 2012 PDF

Unknown Document 2 for TCEQ Plan Review Log No P 02232012 124 Feb 2012

View document
February 23, 2012 PDF

Unknown Submittal Associated with TCEQ Plan Review Log No P 02232012 124 Feb

View document
April 12, 2012 PDF

TCEQ Conditional Approval of Proposed Addition of Chloramines Biocide

View document
June 22, 2012 PDF

TCEQ Draft Guidance Defining Indirect Potable Reuse IPR Vs Direct

View document
June 28, 2012 PDF

TCEQ IWUD Record Hf Membrane Ww Reuse Report Exception 290 42 G

View document
June 29, 2012 PDF

City Schreiber Reaction to TCEQ June 28 2012 Response on Reuse Project

View document
June 29, 2012 PDF

TCEQ Classifies City of Wichita Falls River Road WWTP Reuse Project

View document
June 29, 2012 PDF

TCEQ Enclosures to TCEQ's June 29 2012 DPR Pilot Study Exception Letter

View document
June 29, 2012 PDF

TCEQ June 29 2012 Letter Review of Hf Membrane Exception Requests for

View document
June 30, 2012 PDF

City Scheduling a Call on TCEQ's June 28 2012 Response to the Reuse Project

View document
August 1, 2012 PDF

City Notes of July 27 2012 Phone Conversation with TCEQ's James Red Weddell

View document
August 1, 2012 PDF

Corlett Hinton Availability Reply with Notes of July 27 2012 Call with TCEQ's

View document
August 1, 2012 PDF

Corlett Hintons Notes of 7 27 2012 Call with TCEQ Weddell Lichaa on TCEQ's

View document
August 1, 2012 PDF

Corlett Schreiber Seeks a Direction to Go with This Project After TCEQ Call

View document
August 1, 2012 PDF

TCEQ Direct Indirect Reuse Facility Water Quality Monitoring

View document
August 1, 2012 PDF

TCEQ Revised Reuse Analyte Recommendations Draft Water Quality

View document
August 3, 2012 PDF

TCEQ Written Responses to City's 7 27 2012 Conference Call Questions

View document
August 3, 2012 PDF

TCEQ Written Responses to July 27 2012 Conference Call Questions on

View document
August 30, 2012 PDF

City Schreiber Strategy Email After 8 29 2012 TCEQ Call on Multi Barrier

View document
September 2012 PDF

EPA 2012 Guidelines for Water Reuse EPA 600 R 12 618

View document
November 27, 2012 PDF

TCEQ Internal Meeting Notes on the Wichita Falls DPR Proposal

View document
November 27, 2012 PDF

TCEQ Internal Meeting Notes on Wichita Falls Emergency DPR Concept

View document
January 25, 2013 PDF

TCEQ Draft Minimum Monitoring and Reporting Requirements for DPR Jan

View document
February 8, 2013 PDF

TCEQ Feb 8 2013 Review of the City's DPR Concept Paper 14 Page

View document
February 8, 2013 PDF

TCEQ Review of City's Concept Paper for Emergency DPR Lists TCEQ

View document
April 8, 2013 PDF

TCEQ April 8 2013 Approval for Construction of Temporary DPR

View document
June 5, 2013 PDF

TCEQ Required Inactivation Document for DPR June 5 2013 Image Only

View document
June 7, 2013 PDF

TCEQ Compliance History Report for City of Wichita Falls Wastewater

View document
June 18, 2013 PDF

TCEQ Internal Wichita Falls Industrial Pretreatment Program

View document
June 19, 2013 PDF

TCEQ Draft Minimum Monitoring and Reporting Requirements for DPR June

View document
June 26, 2013 PDF

TCEQ Internal Draft Agenda for June 26 2013 Wichita Falls DPR Project

View document
June 26, 2013 PDF

TCEQ Internal Email on Microfiltration Challenge Test Removal Credit

View document
June 27, 2013 PDF

Biggs Mathews Bmi Response to TCEQ 1st Set of 13 Questions 6 18 13 on Temporary DPR

View document
June 27, 2013 PDF

Unknown City of Wichita Falls DPR Project Response to TCEQ's 1st Set 6 18

View document
July 16, 2013 PDF

Biggs Mathews Bmi Response to TCEQ 2nd Set of 23 Questions 6 26 13 South Washwater

View document
July 16, 2013 PDF

Unknown Cover Email Transmitting 2nd Set of Responses to TCEQ Questions on

View document
July 17, 2013 PDF

City CT Calculations for Reuse Nix Asks TCEQ Whether 1 0 Log Giardia 5

View document
July 17, 2013 PDF

TCEQ 4th Set of DPR Review Comments Comments Based on the February

View document
July 18, 2013 PDF

City CT Calculations and Pathogen Log Removal Credits for DPR Blending

View document
July 19, 2013 PDF

Biggs Mathews Transmittal of 2nd Set of City Responses Attachments to TCEQ on the

View document
July 23, 2013 PDF

City Pathogen Log Removal Credits TCEQ Requirements for Wichita Falls Vs

View document
July 23, 2013 PDF

TCEQ Email Transmitting Pretreatment Program Comments for DPR Project

View document
July 24, 2013 PDF

City Challenges TCEQ's Proposed Giardia Cryptosporidium Shutdown

View document
July 24, 2013 PDF

City Real Time Crypto Giardia Testing and DPR Review Issues Air Gap

View document
July 24, 2013 PDF

Freese Nichols Removal Credit Thread Crypto Giardia Testing at Crmwd Is Standard

View document
July 25, 2013 PDF

Biggs Mathews Bmi Response to TCEQ 3rd Set of Questions 7 05 13 Pathogen Log

View document
July 25, 2013 PDF

Biggs Mathews City Response to TCEQ's 3rd Set of DPR Questions July 5 2013 Virus

View document
July 25, 2013 PDF

Unknown Cover Email Transmitting Supplemental Info on 1st Set of TCEQ

View document
July 29, 2013 PDF

Biggs Mathews Bmi City Response to TCEQ Pretreatment Program Comments July 2013 No

View document
July 29, 2013 PDF

City City's Position on Isolating DPR Water from Cypress Facilities Remove

View document
July 29, 2013 PDF

TCEQ Chronology City of Wichita Falls Emergency DPR Project Summary

View document
July 29, 2013 PDF

TCEQ Chronology Summary of TCEQ City Interaction on the Wichita Falls

View document
July 29, 2013 PDF

TCEQ Response to City on DPR Full Scale Verification Test Shutdown

View document
July 31, 2013 PDF

Biggs Mathews Bmi Response to TCEQ 4th Set of Questions 7 17 13 Decommissioning

View document
July 31, 2013 PDF

Biggs Mathews City Response to TCEQ's 4th Set of DPR Questions July 31 2013 15 Pages

View document
July 31, 2013 PDF

Biggs Mathews City's Response to 4th Set of TCEQ Questions Comments on the DPR

View document
August 14, 2013 PDF

TCEQ Internal TCEQ Email Chain on Wichita Falls DPR Ed Briefing

View document
August 15, 2013 PDF

City City's Response to TCEQ on the Rtpcr Real Time Qpcr Method for

View document
August 15, 2013 PDF

TCEQ Acknowledges Receipt of City's Rtpcr Method Info CT Study

View document
August 26, 2013 PDF

TCEQ Clarification of Lt2 Bin 1 Classification for Cypress 2010 1961 and

View document
September 5, 2013 PDF

TCEQ Appendix Q 9 5 and 10 15 Letters Largest File in This Batch 250mb

View document
September 5, 2013 PDF

TCEQ Conditional Approval to Conduct Full Scale Verification Test for

View document
September 5, 2013 PDF

TCEQ Enclosure a Full Scale Verification Testing Protocol Minimum

View document
September 5, 2013 PDF

TCEQ Enclosure B Fsvt Protocol Monitoring and Reporting of Operating

View document
September 5, 2013 PDF

TCEQ Enclosure E Full Scale Verification Test Report Format Required by

View document
September 5, 2013 PDF

TCEQ Excerpt P 9 of 25 of TCEQ Sept 5 2013 Conditional Approval Letter

View document
September 5, 2013 PDF

TCEQ Full Scale Verification Test Protocol Conditions for the

View document
September 5, 2013 PDF

TCEQ IWUD Index Entry Pilot Study Requirement Exception 290 Rule 42 G

View document
September 5, 2013 PDF

TCEQ IWUD Index Entry Water Treatment for DPR Exception 290 Rule 42 G

View document
September 5, 2013 PDF

TCEQ IWUD Index Entry WWTP Effluent As Water Source Exception

View document
September 5, 2013 PDF

TCEQ Sept 5 2013 Conditional Approval to Conduct Full Scale

View document
September 5, 2013 PDF

TCEQ Sept 5 2013 Modifications Exception Conditions to the City's CT

View document
September 5, 2013 PDF

TCEQ Transmits Conditional Approval Letter and Enclosures a H for

View document
September 5, 2013 PDF

TCEQ Transmittal Email Conditional Approval Letter and Enclosures a H

View document
September 5, 2013 PDF

TCEQ Transmittal of Conditional Approval Letter and Enclosures a H

View document
September 12, 2013 PDF

Freese Nichols Backwash Procedure During Verification Testing Isolating 2010 Plant

View document
September 23, 2013 PDF

Biggs Mathews City Response to TCEQ's Sept 5 2013 Conditional Approval Requests to

View document
October 8, 2013 PDF

TCEQ Internal Sign Off Sheet and Draft Letter Re City's Requested

View document
October 15, 2013 PDF

TCEQ Addendum I Letter 10 15 2013 Modifications to Temporary

View document
October 15, 2013 PDF

TCEQ Oct 15 2013 Addendum I J K Modifications to DPR Exception

View document
October 17, 2013 PDF

City Response to TCEQ Addendum I Turbidity Trigger and Log Removal Credit

View document
October 18, 2013 PDF

City City's Response and Clarification Requests on TCEQ's Conditional Letter

View document
October 2013 PDF

TCEQ Water Supply Division TCEQ Internal Sign Off Sheet and Draft October 2013 Letter with

View document
December 16, 2013 PDF

TCEQ Email Transmitting the Draft Wichita Falls Tpi Targeted Performance

View document
December 2013 PDF

TCEQ Enclosure a Clarifications and Comments on the City's Preliminary

View document
December 2013 PDF

TCEQ Final Report Dec 2013 Targeted Performance Improvement Tpi Visit

View document
December 2013 PDF

TCEQ Targeted Performance Improvement Tpi Visit Final Report December

View document
January 9, 2014 PDF

TCEQ Site Inspection Report Condition 12 Isolation Verification

View document
January 10, 2014 PDF

TCEQ Brookins Directive Halting RR WWTP Effluent Until 1987 SWTP Ceases Email

View document
January 22, 2014 PDF

TCEQ Central File Document Dated 2014 01 22 Planlt Plan Letter

View document
January 22, 2014 PDF

TCEQ Conditional Approval Letter for the Final Engineering Report Fer

View document
January 22, 2014 PDF

TCEQ Conditional Approval of Final Engineering Report for 6 Month

View document
January 22, 2014 PDF

TCEQ Enclosures Jan 22 2014 Clarifications and Comments on City's

View document
January 29, 2014 PDF

City TCEQ Site Visit Exit Meeting Notes Document Requests Unusual Scada

View document
January 29, 2014 PDF

TCEQ Site Visit Exit Meeting Cypress Wtp DPR Facilities Jan 29 2014

View document
January 30, 2014 PDF

City Letter to TCEQ Full Scale Verification Site

View document
January 30, 2014 PDF

City of Wichita Falls City Follow Up Requests After TCEQ Full Scale Verification Site

View document
January 2014 PDF

City Tracking Sheet for TCEQ Dec 2 2013 Site Visit Findings and 12 17

View document
January 2014 PDF

TCEQ Enclosure J Jan 2014 TCEQ Required Monitoring Table for Cypress

View document
January 2014 PDF

TCEQ Enclosure J Part 2 18 Pages Scanned Continuation of TCEQ Required

View document
February 21, 2014 PDF

TCEQ Site Visit Correspondence Feb 21 2014 7 Pages Image Only

View document
April 14, 2014 PDF

City Conference Call April 14 City Explanation and 1 Minute Scada Data for

View document
May 1, 2014 PDF

TCEQ May 1 2014 Notice of Deficiencies in the DPR Full Scale

View document
May 28, 2014 PDF

City Email Thread Explanation of MF Turbidity Alarm Scada Shutdown Logic

View document
May 28, 2014 PDF

TCEQ DPR Correspondence Dated May 28 2014 During Fsvt 2 6 Pages Image Only

View document
May 2014 PDF

TCEQ Region 3 TCEQ Final Report on May 15 19 2014 Onsite Training Data Review

View document
June 27, 2014 PDF

City Blind Copy Recipient List for a June 27 2014 City of Wichita Falls

View document
June 27, 2014 PDF

TCEQ Approval of CT Study for Cypress Temporary DPR Wtp Tp410791 June

View document
June 27, 2014 PDF

TCEQ Approval of Revised CT Study for Cypress 2010 Wtp Tp410071 for

View document
June 27, 2014 PDF

TCEQ Drinking Water Watch Database Printout for the Temporary DPR

View document
June 27, 2014 PDF

TCEQ Enclosure a TCEQ List of Conditions June 27 2014 for the Temporary

View document
June 27, 2014 PDF

TCEQ Enclosures Redacted Copy to TCEQ June 27 2014 DPR Conditional

View document
June 27, 2014 PDF

TCEQ Enclosures Unredacted to TCEQ June 27 2014 DPR Conditional Approval

View document
June 27, 2014 PDF

TCEQ IWUD Index Entry Cross Connection Exception 290 Rule 42 D

View document
June 27, 2014 PDF

TCEQ IWUD Index Entry Hf RO Membrane DPR Report Exception 290 Rule

View document
June 27, 2014 PDF

TCEQ IWUD Index Entry Ph Adjustment Exception 290 Rule 42 G Granted

View document
June 27, 2014 PDF

TCEQ IWUD Index Entry Preformed Chloramine Exception 290 Rule 42 E

View document
June 27, 2014 PDF

TCEQ IWUD Index Entry WWTP Effluent As Source Exception 290 Rule

View document
June 27, 2014 PDF

TCEQ IWUD Record Change to Chloramines Exception 290 42 E 3 G Granted

View document
June 27, 2014 PDF

TCEQ June 27 2014 Conditional Approval of Full Scale Operation of the

View document
June 27, 2014 PDF

TCEQ June 27 2014 Direct Integrity Test Dit Letter for the Cypress

View document
June 27, 2014 PDF

TCEQ June 27 2014 Revised Approval for Use of Chloramines Enclosure F

View document
July 11, 2014 PDF

City of Wichita Falls City Response to TCEQ Approval Letter June 27 2014 and July 8

View document
August 5, 2014 PDF

TCEQ Aug 5 2014 Conditional Approval of Full Scale DPR Operation

View document
August 5, 2014 PDF

TCEQ Conditional Approval of Full Scale Operation of the Temporary

View document
August 5, 2014 PDF

TCEQ Enclosure a List of Conditions for Temporary DPR Wtp Approval

View document
August 5, 2014 PDF

TCEQ IWUD Index Entry Change to Chloramines Exception 290 Rule 42 E

View document
August 5, 2014 PDF

TCEQ IWUD Index Entry Cross Connection Exception 290 Rule 42 D

View document
August 5, 2014 PDF

TCEQ IWUD Index Entry Ph Adjustment Exception 290 Rule 42 G Granted

View document
August 5, 2014 PDF

TCEQ IWUD Index Entry Preformed Chloramine Exception 290 Rule 42 E

View document
August 5, 2014 PDF

TCEQ IWUD Index Entry WWTP Effluent As Source Exception 290 Rule

View document
August 5, 2014 PDF

TCEQ IWUD Record Hf RO Membrane DPR Report Exception 290 42 G Granted

View document
August 5, 2014 PDF

TCEQ Letter Pages 5 6 Documenting RO and MF Membrane Element

View document
August 5, 2014 PDF

TCEQ Page 4 of 4 of TCEQ August 5 2014 DPR Exception Approval Letter to

View document
August 5, 2014 PDF

TCEQ Revised CT Study Approval Letter for Cypress Temporary DPR Wtp

View document
September 1, 2014 PDF

TCEQ Violation Record Routine Chlorite Monitoring Violation Major Dbp

View document
November 3, 2014 PDF

Freese Nichols DPR Working Guidelines Fni Shares Unofficial Summary of TCEQ's Current

View document
November 14, 2014 PNG

TCEQ Drinking Water Watch Screenshot Chlorite Routine Dbp Monitoring

View document
November 2014 PDF

TCEQ Final Report Nov 10 12 2014 Onsite Project Training Opt at

View document
November 2014 PDF

TCEQ Plan Review Letter Log No P 11132014 113 5 Pages Scanned No Ocr

View document
2014 PDF

TCEQ Final Report March 2014 Targeted Performance Improvement Tpi

View document
2014 PDF

TCEQ Notice of Application and Preliminary Decision Major Amendment

View document
2014 PDF

TCEQ Notice of Receipt of Application Amendment of Tpdes Permit

View document
January 8, 2015 PDF

Freese Nichols Exhibits for Jan 14 2015 TCEQ Meeting Agenda Concept Summary Proposed

View document
March 4, 2015 PDF

City Fni List of Proposed Modifications to DPR Conditions E Coli Salt

View document
March 5, 2015 PDF

City City's Proposed Changes to TCEQ DPR Approval Conditions Enclosure a E

View document
March 6, 2015 PDF

CDM Smith CDM Smith Follow Up Asking Nix to Review Edit the Wichita Falls EPA

View document
March 9, 2015 PDF

CDM Smith Nixs Comments on EPA DPR Case Study 6 1 Bg Conserved Through

View document
March 10, 2015 PDF

CDM Smith Scheduling Call Mar 12 2015 Between CDM Smith and Nix on the

View document
March 10, 2015 PDF

TCEQ Plan Review Letter for Wichita Falls Pws 2430001 Dated March

View document
March 2015 PDF

EPA Draft DPR Case Study Write Up on Wichita Falls

View document
April 24, 2015 PDF

TCEQ Approval of Supplemental Permeate Pump Station Lagoon 3 to Raw

View document
April 30, 2015 PDF

Freese Nichols Draft of City's April 30 2015 Request Amendment Email to TCEQ on Kemp

View document
May 8, 2015 PDF

TCEQ Acknowledges City F and N Comments on Draft Approval Letter for

View document
May 8, 2015 PDF

TCEQ Acknowledges Fni City Comments on Draft Conditional Approval

View document
May 8, 2015 PDF

TCEQ Fni Transmits City Comments and Proposed Edits on TCEQ's 5 5 15 Draft

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of Cross Connection Exception 290 Rule

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of Hf RO Membrane DPR Report Exception

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of Ph Adjustment Exception 290 Rule 42 G

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of Preformed Chloramine Exception

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of WWTP Effluent As Source Exception

View document
May 15, 2015 PDF

Freese Nichols Fni Forwards TCEQ's Finalized DPR Exception Approval Letter Pws

View document
May 19, 2015 PDF

Freese Nichols Final TCEQ Authorization to Blend Lake Kemp Water with DPR Mailed May

View document
May 19, 2015 PDF

Freese Nichols TCEQ Final Letter Authorizing Lake Kemp Blending with DPR Mailed May

View document
May 19, 2015 PDF

TCEQ Acknowledges City's Thanks for Expedited Authorization to Blend

View document
May 19, 2015 PDF

TCEQ Fni Thanks TCEQ for Expedited Kemp Blending Authorization City

View document
June 1, 2015 PDF

City of Wichita Falls TCEQ 10233 Plan Review Submittal Form for Temporary Direct Potable

View document
June 19, 2015 PDF

CDM Smith CDM Smith Sends Reworked Wichita Falls Case Study A6 for EPA Potable

View document
June 19, 2015 PDF

CDM Smith Reworked Wichita Falls Case Study A6 for EPA Potable Reuse Supplement

View document
June 22, 2015 PDF

City Nix Returns Commented Wichita Falls Case Study A6 for EPA Potable

View document
June 2015 PDF

TCEQ Notice of Receipt of Application Renewal of Tpdes Permit

View document
July 17, 2015 PDF

TCEQ Conditional Approval of Temporary DPR Decommissioning Report and

View document
July 17, 2015 PDF

TCEQ Exception Approval for Hf RO Membranes at Cypress 2008 RO

View document
July 17, 2015 PDF

TCEQ IWUD Record Change to Chloramines Exception 290 42 E 3 G Granted

View document
July 17, 2015 PDF

TCEQ IWUD Record Cross Connection Exception Request 290 42 D 3 Denied

View document
July 17, 2015 PDF

TCEQ IWUD Record Ph Adjustment Exception Request 290 42 G Denied July

View document
July 17, 2015 PDF

TCEQ IWUD Record Preformed Chloramine Exception Request 290 42 E 3 G

View document
July 17, 2015 PDF

TCEQ IWUD Record Review of Hf RO Membrane Report Exception 290 42 G

View document
July 17, 2015 PDF

TCEQ IWUD Record Review of WWTP Effluent As Source Exception 290

View document
July 17, 2015 PDF

TCEQ July 17 2015 Conditional Approval of Temporary DPR

View document
July 17, 2015 PDF

TCEQ July 17 2015 Exception Letter for Hf MF RO Membranes at Cypress

View document
July 17, 2015 PDF

TCEQ July 17 2015 Revised Contact Time CT Study for Cypress 2008 RO

View document
July 30, 2015 PDF

CDM Smith CDM Smith Sends Two Eem Spectroscopy Papers Reports EPA Nerl Sampling

View document
July 31, 2015 PDF

CDM Smith Eem Spectroscopy for Detecting Sewage Impacted Water EPA Nerl

View document
August 20, 2015 PDF

City TCEQ Expedited Authorization to Blend Lake Kemp Water with DPR May

View document
September 18, 2015 PDF

CDM Smith Draft Case Study a 6 Wichita Falls River Road WWTP and Cypress Wtp

View document
September 18, 2015 PDF

CDM Smith Draft EPA Potable Reuse Supplement Case Study a 6 Wichita Falls River

View document
December 2017 PDF

EPA Office of Ground Water EPA 2017 Potable Reuse Compendium EPA 810 R 17

View document
2017 PDF

TCEQ Notice of Receipt of Application Renewal of Tpdes Wq0010509001

View document
April 24, 2018 PDF

TCEQ IWUD Index Entry Hf Membrane SWTP Report Exception 290 Rule 42 G

View document
January 10, 2023 PDF

TCEQ Presentation Direct Potable Reuse Guidance Rg 634 Sb 905 Case by

View document
Undated PDF

Undated TCEQ Enclosure B Membrane and Conventional Likely TCEQ Monitoring

View document
Undated PDF

Undated TCEQ Title Index Sheet Listing Enclosures to a TCEQ Approval Letter for

View document
Undated PDF

Undated TCEQ Title Sheets Listing Enclosures a J of a Wichita Falls DPR Regulatory

View document
Undated PDF

Undated Unknown Appears to Be a TCEQ Appendix B Water Quality Tpdes and Chapter 210 Reclaimed Water

View document
Undated PDF

Undated Unknown P and S Approval Cid 01 73695 Apparent Plans and Specifications

View document
Undated PDF

Undated Unknown Scanned Compilation of River Road WWTP Tpdes Discharge Permit and

View document
January 29, 2009 PDF

TCEQ Internal Peer Review Email Discussing Big Spring Reuse Project

View document
May 19, 2010 PDF

Freese Nichols Big Spring Water Reclamation Project Process Flow Figure Wastewater

View document
May 26, 2010 PDF

TCEQ Exception Granting Use of MF RO Treated Big Spring WWTP Effluent

View document
May 26, 2010 PDF

TCEQ Grants Exception for Crmwd Big Spring Integrated Membrane MF UF

View document
November 30, 2010 PDF

TCEQ Nov 30 2010 Revision of the May 26 2010 Exception Allowing Crmwd

View document
March 14, 2011 PDF

TCEQ Conditional Plan Review Approval for the Big Spring Regional

View document
April 4, 2012 PDF

Freese Nichols Fni Explains Big Spring Crmwd Reuse Configuration to Nix MF RO UV

View document
April 5, 2013 PDF

TCEQ Reclaimed Water Authorization for City of Big Spring

View document
April 11, 2013 PDF

TCEQ Revision of Big Spring DPR Raw Water Exception Apr 2013 Crmwd

View document
May 3, 2013 PDF

Freese Nichols Email Thread Re Crmwd Rwpf Online Nitrate Nitrite Big Spring DPR

View document
July 8, 2013 PDF

City Nix Asks Fni About Big Spring DPR Performance Crypto Giardia

View document
July 8, 2013 PDF

Freese Nichols Big Spring DPR Status July 2013 Blending Since April 25 2013 Crypto

View document
July 8, 2013 PDF

Freese Nichols Email Thread Re Big Spring Sloan to Nix on Big Spring DPR Status

View document
July 24, 2013 PDF

Freese Nichols Removal Credit History for Big Spring DPR No Explicit Log Removal

View document
December 2013 PDF

Colorado River Municipal Big Spring Raw Water Production Facility Operation and Maintenance

View document
2013 PDF

Watereuse Research Wrrf 11 02 Examining the Criteria for Direct Potable Reuse Nwri

View document
January 15, 2014 PDF

Colorado River Municipal Big Spring Crmwd Raw Water Production Facility Appendices a I to

View document
January 15, 2014 PDF

Colorado River Municipal Crmwd Response to TCEQ July 15 2013 Letter Following May 2013

View document
April 22, 2014 PDF

Carollo Carollo Monitoring Framework for Direct Potable Reuse Slides Texas

View document
April 22, 2014 PDF

Carollo Carollo Monitoring Framework for Direct Potable Reuse Texas Water

View document
September 2, 2014 PDF

TCEQ Investigation Report Crmwd Big Spring Missed Dit and E Coli

View document
September 4, 2014 PDF

TCEQ Sept 4 2014 Conditional Plan Approval for Crmwd Big Spring Raw

View document
October 24, 2014 PDF

Crmwd Crmwd Request to TCEQ to Increase Big Spring Reclaimed Water Blend

View document
February 3, 2015 PDF

City Agrees to Participate in Water Research Foundation Project

View document
February 4, 2015 PDF

City Sends Signed Wrf 4508 Utility Commitment Letter Participate at

View document
April 2015 PDF

Twdb Direct Potable Reuse Resource Document Volume 1 of 2 Contract

View document
April 2015 PDF

Twdb Direct Potable Reuse Resource Document Volume 1 of 2 Statewide DPR

View document
May 29, 2015 PDF

TCEQ Explicitly Labels Crmwd Big Spring Process As Direct Potable

View document
June 24, 2015 PDF

CDM Smith Wrf 4508 Kickoff Data Request to Wichita Falls Assessment of

View document
July 9, 2015 PDF

CDM Smith Wrf 4508 Assessment of Techniques to Evaluate and Demonstrate the

View document
July 24, 2015 PDF

City Southard Sends Wrf 4508 Historical Data Completed to Date for the

View document
August 5, 2015 PDF

City Southard Sends Wrf 4508 Historical Data with Fsv2 Data and Sampling

View document
August 21, 2015 PDF

CDM Smith Wrf 4508 Historical Data Collection Follow Up with Utility

View document
October 22, 2015 PDF

Colorado River Municipal TCEQ Questions to Crmwd on Thm Sampling Location and Blend Ratio

View document
October 30, 2015 PDF

TCEQ Enclosure a Oct 30 2015 TCEQ Revised List of Conditions for Crmwd Big

View document
October 30, 2015 PDF

TCEQ Enclosure a Revised List of Conditions for Crmwd Big Spring

View document
October 30, 2015 PDF

TCEQ Enclosure B Crmwd Reclamation Facility Monitoring Locations Frequency

View document
October 30, 2015 PDF

TCEQ Enclosure B Oct 30 2015 Crmwd Big Spring Reclamation Facility

View document
October 30, 2015 PDF

TCEQ Oct 30 2015 Revision of the Big Spring Crmwd Reclamation

View document
February 2016 PDF

Awwa Opflow Big Spring Texas Raw Water Production Facility DPR Sampling Shows

View document
December 2016 PDF

Carollo Twdb Report Direct Potable Reuse Monitoring Testing Water Quality in

View document
December 2016 PDF

Twdb Contract 1348321632 Direct Potable Reuse Monitoring Testing

View document
December 2016 PDF

Twdb Data Report Appendix a of Raw Laboratory Monitoring Data for the Big

View document
December 2016 PDF

Twdb DPR Monitoring Study of Big Spring Crmwd Municipal Wastewater

View document
2022 PDF

Water Environment Federation Putting DPR Rules Into Context Regulatory Developments Across the

View document
2026 PDF

Journal of Water Reuse and the Emergency DPR Experience Water Quality Lessons from Wichita Falls

View document
Undated PDF

Undated Likely Watereuse Association Published Case Study Profile Section a 6 of Wichita Falls River

View document
Undated PDF

Undated TCEQ Big Springs UV Review Notes Trojan UV Reactor Validation Vs

View document
Undated PDF

Undated Trojanuv Case Study Big Spring Crmwd Raw Water Production Facility MF

View document
Undated JPG

Undated Trojanuv Screenshot of Trojan UV Regression Equation Coefficients in Plc

View document
Undated PDF

Undated Trojanuv UV Case Study Big Spring Crmwd Raw Water Production Facility

View document
Undated PDF

Undated Trojanuv UV Case Study Orange County Water District Gwrs MF RO

View document
April 5, 2012 PDF

CDM Smith April 2012 Strategy City and CDM Smith Plan to Distinguish Wichita

View document
August 30, 2012 PDF

City Aug 30 2012 Schreiber Concludes TCEQ Is Completely Locked in on

View document
August 30, 2012 PDF

City Original Reuse Project Strategy Email TCEQ Locked in on UF RO UV

View document
August 30, 2012 PDF

City Schreiber Strategy Memo After 8 29 2012 TCEQ Call TCEQ Locked Into

View document
August 30, 2012 PDF

City Schreiber TCEQ Locked in on Multiple Barrier UF RO UV Approach After

View document
July 19, 2013 PDF

Freese Nichols Pathogen Log Removal Requirements TCEQ Requiring Wichita Falls 5

View document
July 19, 2013 PDF

Freese Nichols TCEQ Pathogen Log Removal Requirements for Wichita Falls DPR 5 5 Log

View document
July 25, 2013 PDF

City Schreibers Summary of Crmwd Big Spring Regulatory Chain of Events No

View document
July 25, 2013 PDF

Freese Nichols Fni Confirms Big Spring Summary UV Always Planned But Not Piloted

View document
September 23, 2013 PDF

Freese Nichols Fni on Big Spring Approval No Log Removal Accounting from TCEQ Except

View document
July 15, 2014 PDF

City TCEQ Requirements to Extend DPR Beyond 6 Months Add UV and Bury

View document
September 9, 2014 PDF

TCEQ Status of UV Reactor Validation Review for Wichita Falls DPR Ets

View document
September 11, 2014 PDF

TCEQ Approves Ets Sx 850 20 UV Reactor Validation Min Uvt 69 Max

View document
October 3, 2014 PDF

TCEQ City Update to TCEQ on DPR Operation Lake Levels at 21 9 Plan to

View document
October 3, 2014 PDF

TCEQ Oct 2014 City Tells TCEQ DPR Operating Very Well Lakes at 21 9 Fni

View document
October 14, 2014 PDF

TCEQ Approves Trojanuvswift 8l24 2l Validation Study Uvt 70 98 Flow

View document
November 10, 2014 PDF

TCEQ 10 Nov 2014 Letter Granting Exception for UV Disinfection Use in

View document
November 10, 2014 PDF

TCEQ Exception Granting UV Pathogen Removal Credit Trojanuvswift with Enclosures

View document
November 10, 2014 PDF

TCEQ IWUD Index Entry UV Pathogen Removal Exception 290 Rule 42 G

View document
November 10, 2014 PDF

TCEQ Nov 10 2014 Exception Granting UV Pathogen Removal Credit at

View document
November 19, 2014 PDF

Freese Nichols Fni Asks TCEQ to Reconsider Condition 2 Per Reactor Inlet Flow Meters

View document
November 24, 2014 PDF

TCEQ IWUD Index Entry Review of UV Pathogen Removal Exception

View document
November 24, 2014 PDF

TCEQ Nov 24 2014 Exception Letter Approving UV Disinfection Trojanuv

View document
November 24, 2014 PDF

TCEQ Water Supply Division TCEQ Nov 24 2014 Letter Director Review Draft Responding to F and N

View document
December 4, 2014 PDF

Freese Nichols Draft Request to TCEQ for Extension of DPR Authorization Citing UV

View document
December 4, 2014 PDF

Freese Nichols Draft TCEQ Request to Extend Wichita Falls DPR Authorization Beyond

View document
December 8, 2014 PDF

City TCEQ Confirms UV Exception Approval for the Trojan System Attachment

View document
December 8, 2014 PDF

Freese Nichols Request to TCEQ to Extend DPR Authorization Through February

View document
December 10, 2014 PDF

TCEQ Extends Conditional Approval of the Emergency Temporary DPR

View document
December 15, 2014 PDF

City Scheduling Jan 14 2015 TCEQ Meeting on City Proposal to Incorporate

View document
December 29, 2014 PDF

TCEQ 29 Dec 2014 Letter Extends Emergency Temporary DPR Operation

View document
January 13, 2015 PDF

TCEQ IWUD Index Entry Review of UV Pathogen Removal Exception

View document
January 13, 2015 PDF

TCEQ Jan 13 2015 Exception Letter Replacing Nov 24 2014 on UV

View document
January 26, 2015 PDF

Freese Nichols Corrected TCEQ UV Exception Letter Dated 1 13 15 Replacing 11 24

View document
January 26, 2015 PDF

Freese Nichols TCEQ UV Disinfection Exception Approval for DPR Facility Letter Dated

View document
February 9, 2015 PDF

CDM Smith CDM Smith Draft Wichita Falls IPR DPR Case Study for EPA DPR Document

View document
February 17, 2015 PDF

Freese Nichols Fni Transmittal to TCEQ UV Disinfection Installation Notification and

View document
February 19, 2015 PDF

TCEQ Logs the Wichita Falls UV Startup Submittal As Plan Review No P

View document
February 19, 2015 PDF

TCEQ Logs UV Startup Submittal As Plan Review No P 02182015 112 Fni

View document
February 23, 2015 PDF

TCEQ Requests 15 Minute UV Data for Feb 13 2015 and Trojan Boundary

View document
February 23, 2015 PDF

TCEQ Review of UV Startup Submittal Needs 15 Minute Data for 13 Feb

View document
February 25, 2015 PDF

City DPR Continuation UV System in Full Operation Since Feb 13

View document
February 25, 2015 PDF

Freese Nichols Fni Notifies TCEQ That UV Disinfection on the DPR Facility Began Full

View document
February 25, 2015 PDF

Freese Nichols UV Disinfection System on DPR at Cypress Began Full Operation

View document
February 25, 2015 PDF

TCEQ Email Re Wichita Falls DPR Continuation TCEQ Extends DPR Conditional

View document
February 25, 2015 PDF

TCEQ Extends Emergency Temporary DPR Conditional Approval Under Aug

View document
March 2, 2015 PDF

Freese Nichols Draft TCEQ Submittal Package for Lake Kemp Integration with DPR Wf

View document
March 4, 2015 PDF

City Proposed Changes to TCEQ DPR Conditions Enclosure a After 8 Months of

View document
March 4, 2015 PDF

Freese Nichols Fni Proposes Relaxing DPR Conditions Enclosure a After 8 Months of

View document
March 9, 2015 PDF

Freese Nichols Updated Final Wichita Falls TCEQ Submittal Package for Lake Kemp

View document
March 10, 2015 PDF

Freese Nichols Formal Submittal to TCEQ Wichita Falls Request to Blend Lake Kemp

View document
March 10, 2015 PDF

TCEQ 10 Mar 2015 Approval Letter for the Installed UV System at the

View document
March 10, 2015 PDF

TCEQ Letter Extending Authorization for Wichita Falls Emergency

View document
March 10, 2015 PDF

TCEQ Plan Review Letter P 02182015 112 Approving UV System for

View document
March 16, 2015 PDF

Freese Nichols TCEQ Approval Letter Mar 10 2015 for the Installed UV System Received

View document
March 24, 2015 PDF

Freese Nichols TCEQ Mar 24 2015 DPR Project Team Reviewing Kemp Water Submittal 8

View document
March 31, 2015 PDF

City TCEQ Approval of Installed UV System Letter 10 Mar 2015 with

View document
April 1, 2015 PDF

Freese Nichols Fni 1 Apr 2015 Submittal to TCEQ of Updated UV Sops Shutdown Startup

View document
April 1, 2015 PDF

TCEQ Fni Submits Updated City UV Disinfection Sops Monthly UV Sensor

View document
April 8, 2015 PDF

TCEQ Condition 6 of 10 Mar 2015 Letter Requires Alarm and Shutdown

View document
April 10, 2015 PDF

City TCEQ Brookins Conceptually Agrees to Kemp Blending Proposal Wants

View document
April 10, 2015 PDF

City TCEQ Meeting Thread Apr 10 2015 9 18 Am Message on Kemp Proposal and

View document
April 10, 2015 PDF

City TCEQ Status on Lake Kemp Proposal and Revised Approval Letter

View document
April 20, 2015 PDF

TCEQ Clarifies Request City's DPR Alarms and Shutdown Conditions

View document
April 22, 2015 PDF

Freese Nichols Fni Transmits Draft Version 5 4 of DPR Alarm and Shutdown Triggers to

View document
April 22, 2015 PDF

Freese Nichols TCEQ Presses for Revised Alarm and Shutdown Conditions with UV

View document
April 22, 2015 PDF

TCEQ Important Reminder Revised Alarm Shutdown Document Needed Asap

View document
April 22, 2015 PDF

TCEQ Presses for Revised Alarms and Shutdown Conditions Document

View document
April 22, 2015 PDF

TCEQ Request That DPR Alarms and Shutdown Conditions Document Be

View document
April 22, 2015 PDF

TCEQ Requires Alarms and Shutdown Conditions Document Be Revised to

View document
April 23, 2015 PDF

Freese Nichols Fni Transmits UV Monitoring and Reporting Sop and Revised Fso

View document
April 23, 2015 PDF

TCEQ Approval Letter for Two Additional Pumps Fni Transmits Draft V5

View document
April 23, 2015 PDF

TCEQ Lists UV Provisions Missing from City Sops Triggers 3 0 Log

View document
April 24, 2015 PDF

TCEQ Fni Exchange on UV Alarm and Shutdown Triggers Additional

View document
April 29, 2015 PDF

City Conference Call Wichita Falls TCEQ Apr 30 2015 on Rewrite of Aug

View document
April 29, 2015 PDF

TCEQ TCEQ's One Comment on New UV Monitoring and Reporting Sop Daily Off

View document
April 30, 2015 PDF

Freese Nichols City's April 30 2015 Request Amendment to TCEQ Resume DPR at 7 5 Mgd

View document
April 30, 2015 PDF

Freese Nichols Fni Request to TCEQ to Resume DPR at 7 5 Mgd After First Month of

View document
April 30, 2015 PDF

TCEQ City Request to Amend March 2015 Lake Kemp Submittal Resume DPR at

View document
May 1, 2015 PDF

Freese Nichols Fni Transmits Revised UV Monitoring and Reporting Sop 2 to TCEQ with

View document
May 1, 2015 PDF

Freese Nichols Sloan Relays Marlo Berg TCEQ Concerns on Sop Off Spec Time Vs Volume

View document
May 1, 2015 PDF

Freese Nichols Sloan Relays Marlo Berg TCEQ Sop Off Spec Time Volume Concern and

View document
May 5, 2015 PDF

TCEQ Draft Conditional Approval Letter and Enclosures Final UV

View document
May 5, 2015 PDF

TCEQ Transmits Draft Conditional Approval Letter Final UV Approval

View document
May 6, 2015 PDF

City Off Spec UV Time Volume Calculation for SWMOR Alt TCEQ Approval

View document
May 6, 2015 PDF

City Southard Off Spec Time and Volume Calculated from Spreadsheet Into

View document
May 6, 2015 PDF

TCEQ Re Sends Legible Draft Enclosure a List of Conditions for

View document
May 6, 2015 PDF

TCEQ Sends More Legible Draft Enclosure a Pws 2430001 Exception

View document
May 6, 2015 PDF

TCEQ Transmits Draft Conditional Approval Letter and Enclosure a

View document
May 8, 2015 PDF

Freese Nichols Fni Comments on TCEQ Draft Conditional Approval Letter UV Final

View document
May 8, 2015 PDF

Freese Nichols TCEQ Draft Conditional Approval May 5 2015 Final UV Approval Kemp

View document
May 13, 2015 PDF

TCEQ IWUD Index Entry Review of UV Disinfection Exception 290 Rule

View document
May 13, 2015 PDF

TCEQ May 13 2015 Conditional Approval DPR Wtp Modifications Adding

View document
May 13, 2015 PDF

TCEQ May 13 2015 Conditional Approval Letter Replacing Aug 5 2014 DPR

View document
May 19, 2015 PDF

TCEQ Finalized Lake Kemp Blending UV Approval Letter Mailed May

View document
July 17, 2015 PDF

TCEQ IWUD Record Review of UV Disinfection Exception Request 290 42 G

View document
No documents match that search.